Application of the
SiliciO2 – Floor System
Here you will find a short description of the individual product categories.
Primer
1. Preparation of the substrate
- Dust-free, clean, and dry substrate
- depending on the substrate, mechanical surface preparation, for example, by shot peening, may be necessary
2. Processing
- 2x even application on the surface with a short floor roller
- NOTE: Detailed processing descriptions can be found on the respective Technical Data Sheets!
Leveling filler
- Mixing of the leveling filler with recommended mixer (exact mixing ratio must be observed)
- Pour the material onto the prepared surface
- Spread the product with pin-squeegee in the desired layer thickness
- NOTE: Detailed processing descriptions can be found on the respective Technical Data Sheets!
Sealing
- Prepare the material according to the mixing instructions
- Apply the sealer with a short floor paint roller or by spraying
- NOTE: Detailed processing descriptions can be found on the respective Technical Data Sheets!